Projects

You are here:
Main-Photo-web

Singapore 2010- 2013

Roadgrip is proud to have been the selected and approved contractor for all circuit markings and Trackjet surface preparation for the Singapore F1 GP Street Circuit for the past 4 years. The success of this scheme relies upon good planning… Each year we are given a time-critical programme, which is governed by the Land Transport…

Details
jamaica-009-web

Crown Point International Airport, Tobago 2011 – 2013

Roadgrip were contracted to install the new AGL (airfield ground lighting) network for the International Airport in Tobago as part of the Runway Refurbishment in 2011. The works package is for 9000m of ducting in coral and 250 new AGL’s to the Edge and Threshold. The works spanned from April to November 2011 and were…

Details
selfridges_IMG_0144

Selfridges London

Roadgrip undertook a level 1 trial in November 2009 and subsequently negotiated the contract for levels 2-6 of the multi storey car park refurbishment at Selfridges, Oxford Street, London. The works within Selfridges Car Park included 11,000m2 of MMA floor coating to ramps and car park areas, all concrete repairs and floor preparation prior to…

Details
Falkland_03

FALKLAND ISLANDS AIRFIELD

Roadgrip have overcome many challenges in the past few years working in some of the more remote parts of the world. What better idea then, in the late summer of 2010 as the warm weather was beginning to ebb in the UK, to pack up and head into the depths of an Antarctic late winter?…

Details
DSC02211-web

Silverstone – British Formula One & Moto GP 2007-2013

Silverstone signed a 17 year deal from 2010 for F1 and a 5 year deal for MotoGP coupled with the FIA GT race and a number of other events. This kept the Roadgrip team busy for the summer months as we undertook preparations of the circuit and event areas – which we’ve continued to do…

Details
bahrain_3

Bahrain F1 Grand Prix Circuit

In February 2009, Roadgrip were tasked with applying the unique branding that has become synonymous with Motorsport in Bahrain for the 2009 Gulf Air F1 GP. The intricate Arabesque patterns and National Branding were an engineering challenge, but the finished product was commented on across the motorsports community. The works were successfully completed and demonstrated…

Details
100_0429

HIDD PORT, BAHRAIN

Roadgrip were appointed as the pavement marking contractor on this multi-million dollar scheme in Bahrain. Having prequalified and priced the markings in summer 2008, Roadgrip had only 3 weeks to mobilise from order and 3 months to complete the work. There was a total of 300,000 linear metres of paint line applied on this project…

Details
Main-Photo-web

Lotus Test Track 2011/2012

The re-development of the Lotus Test Track at the Hethell Engineering works, near Norwich, secured another venue for Roadgrip’s motorsport specialist team. The old RAF Base is now a state of the art test track for proving and demonstration. Roadgrip were contracted to paint the run-off designs and circuit branding in FIM/FIA antislip paint, plus…

Details