News

You are here:

Austria F1 2015

Austria

                Roadgrip were back in Austria in June for the 2015 Formula One; applying all track markings and run off designs to the Red Bull Ring located 100km south of Vienna in Spielberg. This was the second year running our team have been assisting the ‘look and feel’ of…

Details

Airfield Markings – Bahamas

Pic1

Roadgrip delivered all runway and taxiway markings in the winter of 2014/15 on Normans Cay, Bahamas. Normans Cay is a small Bahamian island in the Exumas, a chain of islands south east of Nassau which is most famous for being the headquarters of Carlos Lehder’s drug smuggling operation in the late 70’s early 80’s. Works…

Details

US F1 GP 2014

photo 1

Roadgrip are proud of their hard work in Austin Texas over October/November 2014. The Roadgrip Motorsport team delivered the US F1 GP for 2014 , with the re-introduction of ‘the stars’. This final touch really set the design off and gave some very strong television visuals….and another strong win for Lewis made for a great…

Details

Russian F1 GP 2014

Russia Photo

Roadgrip Motorsport delivered the inaugural Russian F1 GP in October 2014. FIA track painting and run off designs followed site surveys, design brief and the subsequent production of renders for the new Tilke designed circuit in Sochi’s Winter Olympic Park. All equipment and materials were driven by road (some 2000 miles!) and the circuit specialist…

Details

Farnborough Air Show 2014

Farnbro Comp

As part of the preparations for the 2014 Farnborough Airshow, Roadgrip were appointed to carry out a package of airfield marking and runway rubber removal works. The works to the runway included the deployment of Roadgrips’ TrackJet Rubber removal system to remove tyre rubber build up and improve friction on the touch down zone areas…

Details

Singapore 2014 FP GP

image1

Roadgrip are proud to have delivered all race track painting, race track cleaning and retexturing for the Singapore F1 GP in September 2014. A restricted programme coupled with challenging weather and pedestrians plentiful make this project particularly challenging! The Roadgrip team were on site for 3 weeks, delivering run off branding designs in line with…

Details